Energy

Fuel Additive System Upgrades

The scope of work included:

  • Installation of two new additive injection package systems at the Pelican Point facility to the existing truck loading gantry
  • Each injection system was expected to include a 35kL capacity horizontal storage tank, unloading pump, additive injection skid and associated facilities.
  • Identification & Select phase for the definition of scope and development of engineering driven by achievement of the quality levels of the AACEI 18R97 (2020) Cost Estimate Classification System – Process Industries.

BPM Projects completed the following phase objectives:

  • Project definition to AACEI Class 3 (-20%/+30%) estimate with a corresponding schedule, including a defined project scope
  • Hazard Identification (HAZID)
  • Engagement of trusted subcontractors for the performance of Electrical and Instrumentation scope of work.

Outcome

BPM performed beyond the required identification phase and completed a combined identification/select phase. Combining these phases as a single program of work represented a cost saving, schedule agility and aimed to support a quicker FID decision for our client.​

​