Skip to content

Asset Integrity

Major Hazardous Facility – Dockline Replacement

BPM’s scope of work included:​

  • Cost estimate of project to AACEI Class 3 (-20%/+30% accuracy)​
  • Preliminary schedule and outage durations to allow for early planning​
  • Facilitate a preliminary Hazard Analysis (PHA) workshop with Client.
  • Undertake Process design for proposed new docklines to AS2885 including but not limited to pipe dimensions, pressure and temperature limits, stress criteria and fluid velocity​
  • Preliminary design of replacement pipelines.