Major Hazardous Facility – Dockline Replacement
Performance of FEED study for the replacement of thirteen (13) and removal of four (4) docklines located in a major hazard facility to ensure that the pipelines met a design life of 50 years.
BPM’s scope of work included:
- Cost estimate of project to AACEI Class 3 (-20%/+30% accuracy)
- Preliminary schedule and outage durations to allow for early planning
- Facilitate a preliminary Hazard Analysis (PHA) workshop with Client.
- Undertake Process design for proposed new docklines to AS2885 including but not limited to pipe dimensions, pressure and temperature limits, stress criteria and fluid velocity
- Preliminary design of replacement pipelines.
Explore More Case Studies
Energy
Tank Service Swap
Tank service conversion with completion of Concept Study and Detail Design.
Read More →
Asset Integrity
Bund Upgrade Program
Full design and project delivery to ensure bund integrity for a major Fuel Terminal.
Read More →
Energy
Tallow Storage Optimisation
Detailed analysis for increasing Tallow storage to increase capacity.
Read More →