Energy
3.8 ML Fuel Storage Tank, Saipan
BPM Projects was engaged to perform the Detailed Engineering & Design and Project Delivery for a 3.8ML Fuel Storage Tank in Saipan. The scope included earthworks, foundations and piping tie-ins and to increase existing secondary storage capacity to 110% of tank volume to comply with NFPA-30.
Our role
- Provision of multi-discipline engineering and project management to perform FEED and Detail Engineering and Design in accordance with Client Practices and US codes and standards.
- Pre-qualification of EPC tenderers followed by tender document preparation, bid evaluation, recommendation for award and contract administration.
- Performance of engineering and design review, HAZOP, fabrication QA/QC and pre-start safety verification.
- Project Controls providing budget and schedule reporting and forecasting.
- Full time on-site supervision of construction contractors for safety, schedule and quality performance.
Explore More Case Studies
Energy
Expert Advisory of internal organisation, project implementation and governance
Discover BPM Projects' evaluation of project execution and governance for implementation of future project success.
Read More →
Energy
Tank Service Swap
Tank service conversion with completion of Concept Study and Detail Design.
Read More →
Asset Integrity
Bund Upgrade Program
Full design and project delivery to ensure bund integrity for a major Fuel Terminal.
Read More →