Waste Water Facilities

Wastewater Treatment Plant (WWTP) Upgrade

Our Role

There was a requirement to upgrade the wastewater treatment facility at our client’s major Terminal and complete the primary separation of the wastewater streams in upstream separators. The water cut from the primary separation is sent to the Waste Water Treatment Plant (WWTP) at the facility. The fat / tallow cut will be sent to a separate tank that will facilitate the removal of this stream as a saleable item, rather than a waste stream.​

BPM Projects was engaged to perform a FEED to enable the ability to store and complete primary separation of the waste stream.​

Key aspects of the FEED included:​

  • Undertake preliminary design study to upgrade the upstream effluent storage and primary separation.​
  • Conduct a site inspection to verify as-built conditions regarding the existing storage vessel intended for re-purposing, including collection of site information, equipment and piping layouts.​
  • Assess site tank layouts and volumes.​
  • Undertake preliminary FEED for the proposed upgrade.​
  • Issue a Preliminary Design package and FEED close out report.
  • WWTP Package integration as Outside Battery Limits (OSBL) scope of work.​

The FEED output satisfied a 30% design maturity to achieve a Class 3 Capex Estimate. ​

​

​

​

​

​

​

​

​